UPDATE β Invoicingβ―Β Β Β
- Credit Return to WIP is now available on invoices that include pre-billed stages.Β Read more
UPDATE βΒ Resource Planning β―Β
- Add a full week of resourced hours for a staff member on a project with a single click, using the new βAddβ button. This is featured at the beginning or end of their resourced period
- Transfer hours from one staff member to another in resource planning
UPDATE βΒ Project Scheduleβ―Β
- Thereβs a new confirmation pop-up when setting a staff member to 0 hours in project planning
UPDATE βΒ SharePointβ―Document Controlβ―Β
- Document or project folder names that are changed in Synergy will now automatically update in SharePoint
- Delete documents in both Synergy and SharePoint with a single click in the document library
UPDATE βΒ Document registerβ―β―Β
- Download multiple documents (up to four) as a ZIP file to your local machine from the project documents page.Β Read moreβ―Β
- A copy of the ZIP file will be saved in the staff memberβs βTemporary documentsβ
UPDATE β Transmittalsβ―β―Β
- The Revision date will now be the latest updated date for the document
UPDATE βΒ Project performanceβ―Β
- You can now filter the Project performance page by Stage Manager
UPDATE β Other enhancements
- Performance enhancements to the resource planning board have been made for faster loading times
- Transmittalβ―emails willβ―include the subject and message in the body text when sent out
- MYOB contact import will now import contacts with all the personnel under that company in Synergy
- βTeam staff is Defaultβ has been re-named to βTeam staff is Primaryβ in the βTeamβ report type in Synergy reporting
